COST SIMULATOR

We would rather not explain it in words

Put in your own site quantities. What goes down depends on what you are replacing. All figures are in KRW.

Which point would you like to cost?

COST SIMULATION

Simulation — the SP head branch point on the branch line

Just enter the number of heads. What changes against the conventional method, and by how much, comes out on the spot.

Conventional method
PLS Outlet Fitting

The main pipe is cut, a tee is inserted, and both sides are weldedBT · ST Outlet Fittings

500 heads
1005,000
2,180,000 KRWexact: 2,182,000 KRW

500 SP heads · Welded tee insertion replaced by BT

Get a formal quotation on these terms

What changes over 500 heads — figures that owe nothing to any unit price

Weld points
1,000 points500 points
Main pipe cutting
1,000 times0 times
Bevel preparation
1,000 times0 times
Work points per head6 points3 pointsWelding, main pipe cutting and bevel preparation, plus the main pipe drilling and surface preparation that the outlet method newly adds. Each task takes a different amount of time
What shortens the schedule1,500 fewer work pointsThis is the number of tasks that disappear from the site. How many days are saved depends on the manpower deployed
The basis of this simulation
KRW / point

Put in your own purchase price and everything is recalculated on that basis.

  • Scope — the fittings, welding, threading and cutting at the point where the branch line takes off to an SP head. Main pipe and cross-main take-offs, the head itself and the pipe material are not included.
  • Sizes — SP head branch fittings come as 50×25 · 40×25 · 32×25 · 25×25 depending on the branch line diameter. This calculation is based on the smallest, 25×25; where larger diameters are mixed in, the saving is greater than this.
  • Labor cost — a fixed rate is applied (visitors cannot change it). For a calculation on your own labor rates, please ask for a quotation.
  • Construction period — weld points are halved and main pipe cutting and bevel preparation disappear, so the schedule shortens. How many days are saved depends on manpower and parallel work, so we do not put a figure on it.
  • The connection on the branch side is one point in either method, so it is left out of the calculation.
  • Actual amounts may vary with site conditions and the material supply situation.

PLS TECHNOLOGY

This saving comes from PLS technology and products

It is not a number made by cutting prices. Weld points go down, the main pipe is never cut, and the welding conditions are fixed by the geometry — so the steps themselves disappear. The comparison with conventional methods, the difference between BT and ST, and the section geometry are all set out under PLS technology.